On this page4
  1. What heat treatment does
  2. Why batch size matters
  3. What you can do
  4. Request a Production-Volume Quotation

A furnace cycle is run for a load, not for one piece. The time, energy and handling for that cycle are the same whether the furnace holds one knife or a full load. A production quantity uses the cycle fully.

What heat treatment does

StagePurpose

Annealing
Softens and relieves stress so the steel can be machined and stays stable.
Quenching
Cools the steel quickly to set the structure that gives the knife its strength.
Tempering
Reheats at a controlled level to balance strength and toughness for the job.

StagePurpose

Annealing
Softens and relieves stress so the steel can be machined and stays stable.
Quenching
Cools the steel quickly to set the structure that gives the knife its strength.
Tempering
Reheats at a controlled level to balance strength and toughness for the job.

The settings depend on the steel and the knife design. They are confirmed for your order in the quotation.

Why batch size matters

  • A cycle has a fixed duration.

    Heating, holding and cooling take time regardless of load size.

  • Handling and loading are fixed.

    Racks, baskets and protection are prepared for each load.

  • Parts that need different cycles cannot share a load.

    A single odd piece may need its own.

  • Planning matters.

    Matching pieces by steel and size lets a load run efficiently.

  • A cycle has a fixed duration.

    Heating, holding and cooling take time regardless of load size.

  • Handling and loading are fixed.

    Racks, baskets and protection are prepared for each load.

  • Parts that need different cycles cannot share a load.

    A single odd piece may need its own.

  • Planning matters.

    Matching pieces by steel and size lets a load run efficiently.

What you can do

  1. Group requirements by steel and size into one production-volume order.

  2. Tell us your annual volume so loads can be planned ahead.

  3. Keep the specification stable across scheduled releases.

  1. Group requirements by steel and size into one production-volume order.

  2. Tell us your annual volume so loads can be planned ahead.

  3. Keep the specification stable across scheduled releases.

Why can’t one knife share a load with others?

It can only share a load with pieces that need the same steel and cycle. Without them, it needs a separate cycle.

Does a bigger load change the quality?

A well-planned load is treated to the same specification for every piece in it. Planning and inspection keep it consistent.

Where are the settings confirmed?

In your quotation, based on your drawing, steel and machine.

Request a Production-Volume Quotation

Send your drawing, the steel grade if known, and the quantity per order.

Section
Education
Reading time
2 min read

Discuss this with our team

Tell us what you need and our team replies by email.

Send an enquiry